kids encyclopedia robot

Image: First lockage of the 2012 season (6850600444)

Kids Encyclopedia Facts
Original image(2,000 × 1,823 pixels, file size: 1.32 MB, MIME type: image/jpeg)

Description: SAULT STE. MARIE, Mich. - The Canadian Coast Guard Cutter Samuel Risley breaks through some light ice in the Poe Lock, March 16. Though not the much anticipated first freighter through the locks, the season for the U.S. Army Corps of Engineers always starts with the locking of upbound icebreakers to open the harbors and bays of Lake Superior.(U.S. Army Corps of Engineers photo by Kim Dautremont)
Title: First lockage of the 2012 season (6850600444)
Credit: First lockage of the 2012 season Uploaded by High Contrast
Author: U.S. Army Corps of Engineers Detroit District
Usage Terms: Public domain
License: Public domain
Attribution Required?: No

The following page links to this image:

kids search engine